Saturday 18 October 2008









The units were moved into the kitchen together with the new cooker and washing machine. The kitchen started to take shape.

After collecting the units in a couple of trips to a well known Sweedish store near Leeds and dropping them off at 10.00 pm at night they were eventually put together.

They were built up in the living room - including the corner unit - which only just went through the door.

Kitchen floor

Once all the kitchen units were out the new tiles were put down ready for the units to be fitted

Friday 12 September 2008

The new windows were put in




The new windows were put in at the end of July.

Removal of the carpets


The carpets needed to be removed - and the bungalow had a sweeter smell once they had gone.


Removal of the kitchen
















Thursday 11 September 2008

Bedroom 1




Overlooking the front garden

Bedroom 2


The second bedroom

The 3rd Bedroom



This is the small bedroom (bedroom 3)

The Hall


The hall with the old front door - and curtain and carpet

The Kitchen







The kitchen - probably put in in the 1970s. It can be seen from the photos that the units really did need replacing. This is before!






The Bathroom














This is the bathroom. It will evenutally be replaced with something not quite as 'turquoise'.

Friday 22 August 2008



The bunglaow has a front garden
and a back garden (with lots of ivy) and a garage










In the beginning!

There was a bungalow. It had three bedrooms a bathroom, a kitchen (of sorts) and a living room.

The bungalow had been empty for some time and was waiting for the right people to come along and love it